PHOTO RELEASE: High-Speed Rail Completes Two Grade Separations in Fresno County

July 15, 2024

KOJ YUAV TSUM PAUB:

Two new overcrossings are now complete and open to traffic in Fresno County. The Mountain View Avenue overcrossing is 381 feet long and 40 feet wide. The Floral Avenue overcrossing is more than 368 feet long and more than 40 feet wide. Both structures will take traffic over the BNSF railroad and future high-speed rail tracks.

 

FRESNO NROOG, Calif. – The California High-Speed Rail Authority (Authority) today announced the completion of two new high-speed rail overcrossings in Fresno County. The Mountain View Avenue and the Floral Avenue grade separations are now open to traffic.

 

Mountain View grade separation in Fresno County

Mountain View Grade Separation in Fresno County

Floral Grade Separation in Fresno County

Floral Grade Separation in Fresno County

Construction began in 2023 on both high-speed rail structures and were built by contractor Dragados-Flatiron Joint Venture (DFJV). The Mountain View Avenue Grade Separation is located between Cedar and Peach avenues.

Mountain View Avenue Grade Separation by the numbers:

  • 368 feet long
  • 40 feet wide
  • 16,000 cubic yards concrete
  • 400,000+ pounds of steel
  • 16 pre-cast concrete girders, all manufactured at the DFJV Pre-Cast Facility in Hanford.

Mountain View Avenue Grade Separation by the numbers: • 368 feet long • 40 feet wide • 16,000 cubic yards concrete • 400,000+ pounds of steel • 16 pre-cast concrete girders, all manufactured at the DFJV Pre-Cast Facility in Hanford.

The Floral Avenue Grade Separation is located between Cedar and Chestnut avenues.

Floral Avenue Grade Separation by the numbers:

  • 381 feet long
  • 40 feet wide
  • 1,600 cubic yards concrete
  • 400,000+ pounds of steel
  • 16 pre-cast concrete girders, all manufactured at the DFJV Pre-Cast Facility in Hanford.

Floral Avenue Grade Separation by the numbers: • 381 feet long • 40 feet wide • 1,600 cubic yards concrete • 400,000+ pounds of steel • 16 pre-cast concrete girders, all manufactured at the DFJV Pre-Cast Facility in Hanford.

“Safety is of the utmost importance during and after construction of the high-speed rail project. Grade separations are important to ensure safety around the surrounding communities during future operations. They eliminate existing at-grade crossings, improving safety for vehicular traffic while also reducing traffic congestion and reducing greenhouse gas emissions from idling vehicles.” –Garth Fernandez, Central Valley Regional Director.

Construction progresses every day on the high-speed rail project between Madera and Tulare counties. The Authority has begun work to extend the 119 miles currently under construction to 171 miles of future electrified high-speed rail from Merced to Bakersfield.

Tam sim no muaj ntau dua 25 qhov chaw tsim kho nyob hauv California Central Valley, nrog rau Lub Tuam Txhab kuj tseem muaj ib puag ncig tshem tawm 422 mais ntawm txoj kev tsheb ciav hlau ceev los ntawm Bay Area mus rau Los Angeles County.

Since the start of high-speed rail construction, the project has created more than 13,000 good-paying construction jobs for residents, a majority going to residents of the Central Valley. Nearly 1,500 workers are dispatched to a high-speed rail construction site daily.

For the latest on high-speed rail construction, visit www.buildhsr.com.

Cov kab ntawv txuas hauv qab no muaj cov yeeb yaj kiab tsis ntev los no, cov yeeb yaj kiab, duab, duab, xovxwm chaw pabcuam thiab cov duab tshiab:https://hsra.app.box.com/s/vyvjv9hckwl1dk603ju15u07fdfir2q8

Cov ntaub ntawv no yog txhua yam muaj rau kev siv dawb, kev lees paub los ntawm California High-Speed Rail Authority.

 

Cov hais lus Bureau

California Kev Ciav Hlau High Speed Speed Authority ເວົ້າ lus chaw ua haujlwm yog tswj hwm los ntawm Lub Chaw Haujlwm Txuas Lus thiab muab cov ntaub ntawv kev tshaj tawm xov xwm ntawm High-Speed Rail Program.

Hais Rau Cov Hais Lus

Sib cuag

Augie Blancas
(559) 720-6695
augie.blancas@hsr.ca.gov 

 

 

 

MEDIA NQI

Txhua qhov chaw yuav tsum muaj.

Xeev California Txoj Kev Loj Ciav Hlau ua txhua yam kom xyuas tau lub vev xaib thiab nws cov lus qhia ua tau raws li tsab cai ADA raws li Xeev California Txoj Cai Kev Nkag mus Nkag Siab Cov Lus Qhia Ua Ntej 2.0 Theem tus qauv. Yog tias koj tab tom nrhiav ib daim ntawv tshwj xeeb tsis nyob hauv California Daim Ntawv Ceev Cov Hluav Taws Xob Tsav Tsheb Ceev lub vev xaib, koj tuaj yeem thov cov ntawv no nyob rau hauv Cov Ntaub Ntawv Kev Ceev Ntaub Ntawv los ntawm Pej Xeem Cov Ntaub Ntawv Cov Cai. Yog tias koj muaj lus nug dab tsi txog lub vev xaib lossis nws cov ntsiab lus, thov hu rau Tus Thawj Coj ntawm info@hsr.ca.gov.