VIDEO RELEASE: 3D Public Art Demonstrating Future California High-Speed Rail Service and The Portal Unveiled

October 7, 2024

SAN FRANCISCO – The California High-Speed Rail Authority (Authority) and Transbay Joint Powers Authority (TJPA) unveiled an interactive public art piece that provides a 3D representation of The Portal project, which will bring high-speed rail service to the multimodal Salesforce Transit Center.

Screenshot of the California High-Speed Rail Authority's Video Release showcasing a 3D Public Art demonstrating the future high-speed rail at the SalesForce Transit Center.

Click image for video.

 

Dozens of transit enthusiasts and advocates unveiled the #ThePortalSFtoHSR installation outside the Salesforce Transit Center at Mission and Fremont Street.

The 3D interactive art piece allows people to peer 60 feet below ground, or two full levels into the train platform where riders could board a high-speed train and arrive in Los Angeles in under three hours. The public can take pictures with the installation, post them to their social media, and tag @cahsra and @transitcentersf with #ThePortalSFtoHSR.

“This interactive installation provides a rare glimpse into the existing two-level trainbox found in the basement of the Salesforce Transit Center waiting for trains to arrive through The Portal project. Thanks to a $3.38 billion commitment from the federal government, The Portal project is now over three-quarters funded. We invite the public to interact with this 3D art piece and envision the future of rail in uniting the Bay Area and connecting California.”

– Adam Van de Water, Executive Director, Transbay Joint Powers Authority

“The Golden Gate Bridge, cable cars, and the Ferry building are some of the iconic symbols people think of when they think of San Francisco. The Salesforce Transit Center, with high-speed rail and Caltrain in its basement, will be the next San Francisco transportation icon. It’s no longer a question of whether California will have a high-speed rail system but only how much of the high-speed rail system we want to have and how soon.”

– Boris Lipkin, Authority Northern California Regional Director

The Portal, also known as the Downtown Rail Extension, will extend Caltrain’s 77-mile service from San Francisco Fourth and King Street and the statewide high-speed rail system to the Transit Center in the heart of downtown San Francisco. This transformational infrastructure investment will ultimately connect 11 transit systems from the Bay Area and Southern California, bringing communities closer, reducing climate change impacts, and providing Bay Area residents with better access to jobs, housing, and economic opportunities.

For more information about The Portal, visit: https://www.tjpa.org/portaldtx.

The Authority has begun work to extend the 119 miles under construction to 171 miles of electrified high-speed rail from Merced to Bakersfield. Since the start of construction, the Authority has created nearly 14,000 construction jobs, with more than 70% going to residents from disadvantaged communities.

有关施工的更多信息,请访问: www.buildhsr.com.

以下链接包含最近的视频、动画、摄影、新闻中心资源和最新效果图: https://hsra.app.box.com/s/vyvjv9hckwl1dk603ju15u07fdfir2q8

这些文件均可免费使用,由加州高速铁路管理局提供。

 

 

 

演说局

加州高速铁路管理局发言人局由通讯办公室管理,提供有关高速铁路计划的信息演示。

请求演讲者

接触

范孝
916-502-3726(c)
Van.Tieu@hsr.ca.gov

Lily Madjus Wu
415-949-9500 (c)
lmadjuswu@tjpa.org

媒体查询

各个领域都需要。

加利福尼亚州高铁管理局尽一切努力确保网站及其内容符合加利福尼亚州规定的Web内容可访问性指南2.0级AA标准所规定的ADA规定。如果您要查找不在加利福尼亚高速铁路管理局网站上的特定文件,则可以通过“公共记录法”页面根据“公共记录法”来请求该文件。如果您对网站或其内容有任何疑问,请通过以下方式与管理局联系: 邮箱:info@hsr.ca.gov.