VIDEO RELEASE: High-Speed Rail Celebrates Groundbreaking of McKinley Avenue and Golden State Boulevard Grade Separation Project

December 10, 2024

您需要了解什么:

The McKinley Avenue and Golden State Boulevard Grade Separation Project will help improve safety for drivers, bicyclists and pedestrians in the city of Fresno. Spanning 402 feet long, the structure will take traffic over the existing freight and future high-speed rail tracks.

 

加利福尼亚州弗雷斯诺 –The California High-Speed Rail Authority (Authority) alongside local and state leaders today celebrated the groundbreaking of the McKinley Avenue and Golden State Boulevard Grade Separation in the City of Fresno.

Start the above player to watch the video.

“Breaking ground on this massive grade separation highlights continued progress the high-speed rail project is making in California’s Central Valley. This paves the way toward fulfilling our commitment to Californians by delivering a state-of-the-art, electrified high-speed rail system capable of achieving speeds of 220 mph.”
– Ian Choudri, Authority CEO 

The McKinley Avenue and Golden State Boulevard grade separation project is located between State Route 99 and West Avenue in Fresno. When complete, the grade separation will serve as a four-lane roadway, spanning 402 feet long and more than 78 feet wide. The bridge will also have pedestrian access and bike lanes improving safety for residents in the area. The grade separation is being built by contractor Tutor-Perini/Zachry/Parsons.

“It’s great to see progress on the nation’s first high-speed rail system during such a pivotal time in Fresno’s history. We continue to see commitment, belief, and investments in our city from our partners at the state level, and today’s groundbreaking supports the larger goal of a transformative rail system and station in our city’s core – all while ensuring improved pedestrian safety and traffic flow around the tracks.”
– Mayor Jerry Dyer, City of Fresno

Graphic shows a rendering of the future structure on the left, and a high up drone shot of the current state of the real McKinley Avenue. Graphic looks like arrows pointing from left to right, symbolizing process and progress.

The Authority has begun work to extend the 119 miles currently under construction to 171 miles of future electrified high-speed rail from Merced to Bakersfield. The Authority also has full environmental clearance on 463 miles of the high-speed rail program from the Bay Area to downtown Los Angeles.

There are more than 30 active construction sites and nearly 50 completed structures in California’s Central Valley. Since the start of high-speed rail construction, the project has created more than 14,000 construction jobs, a majority going to residents of the Central Valley.

In addition, the Authority is committed to small businesses playing a major role in the build out of the project. A total of 875 certified small businesses have worked on the high-speed rail program statewide, with 229 of those certified small businesses residing in the Central Valley.

欲了解高铁建设最新动态,请访问: www.buildhsr.com

以下链接包含最近的视频、动画、摄影、新闻中心资源和最新效果图: https://hsra.app.box.com/s/vyvjv9hckwl1dk603ju15u07fdfir2q8

Files are all available for free use, courtesy of the California High-Speed Rail Authority.

Open below images for larger versions.

 

演说局

加州高速铁路管理局发言人局由通讯办公室管理,提供有关高速铁路计划的信息演示。

请求演讲者

接触

奥吉布兰卡斯
559-720-6695 (c)
augie.blancas@hsr.ca.gov

媒体查询

各个领域都需要。

加利福尼亚州高铁管理局尽一切努力确保网站及其内容符合加利福尼亚州规定的Web内容可访问性指南2.0级AA标准所规定的ADA规定。如果您要查找不在加利福尼亚高速铁路管理局网站上的特定文件,则可以通过“公共记录法”页面根据“公共记录法”来请求该文件。如果您对网站或其内容有任何疑问,请通过以下方式与管理局联系: 邮箱:info@hsr.ca.gov.