Rendering of a high-speed rail train. Under it is text that reads, "Transforming California's Future." On the right are three images of construction sites. The top has two workers on a bridge. The middle is a construction site next to a busy road. The bottom is a viaduct crossing a freight rail line.

2026 DRAFT BUSINESS PLAN

A Draft 2026 Business Plan was issued February 28, 2026, with a 60-day public comment period.

下載計劃*

For questions and to leave comments, use our online 2026 Draft Business Plan Comment Form 或聯絡我們 BusinessPlan2026@hsr.ca.gov.

概述

High-speed rail is more than fast trips between the Bay Area and the Los Angeles region. It is the opportunity to connect the communities in between — Gilroy, Merced, Fresno, Bakersfield, Palmdale, and others — to the state’s largest job centers and innovation hubs in ways that expand access to opportunity.

Early commercial success and ancillary revenue generation create a durable pathway to expand and complete the system without relying exclusively on new public funding. This 2026 Business Plan outlines the first true revenue strategy for California high-speed rail.

This is a once-in-a-generation investment in California’s future.

Bold Solutions for a Bold Vision

The California high-speed rail will deliver fast, reliable, zero-emission train service connecting the state’s major economic regions and the Central Valley. The project will expand access to jobs, education, and affordable housing, while reducing emissions and providing an alternative to congested highways and airports. This 2026 Business Plan provides the most detailed and robust business case and roadmap yet for building California High-Speed Rail.

Graphic shows the vision of California High-Speed Rail. There is an image of dots connected by a line representing mobility, which reads Increase options and opportunities for where Californians can live and work by connecting affordable communities with job centers. Next is an image of a bar chart for economic growth that reads Create a corridor of opportunity for businesses and new technologies. Next is a map of California for Connection that reads,

 

Making the Vision a Reality – Merced to Bakersfield

As initiated in the 2025 Supplemental Project Update Report, rather than constructing a “full buildout” for initial service, the Authority’s strategy is to right-size initial delivery to control costs and begin service sooner, and then expand infrastructure as demand grows.

A graphic that shows the vision for the Merced to Bakersfield segment through multiple icons and text. The first is a piggy bank that represents savings and reads, “Rather than start with a full-capacity build, the Authority saved $2 billion in the Merced-Bakersfield segment by focusing on initial service.” The next is a train that represents trips per day and reads, “Initial service will begin with a planned 8 trips per day in both directions.” The next is tracks that represents tracks that reads, “The Authority will begin laying down tracks in 2026 and the first sets of trains will be ordered.” The next is a ticket that represents fare service and reads, “With tracks and electric system installation in 2026, the Authority anticipates train testing lasting 2 years with fare service from Merced to Bakersfield beginning in 2033.” Finally, there is a road traveling under a viaduct that represents safety and reads, “The project is already having a positive impact on road safety, with dozens of new overcrossings opening throughout the area.”

接觸

董事會

托馬斯·理查茲,主席
南希·米勒,副主席
歐內斯特·卡馬喬
艾米莉·科恩
瑪莎·M·埃斯庫西亞
亨利·佩雷亞
林恩申克
安東尼威廉姆斯
傑弗裡·沃斯
boardmembers@hsr.ca.gov

首席執行官

伊恩喬德里
boardmembers@hsr.ca.gov

當然董事會成員

Honorable Anna Caballero
尊敬的胡安·卡里略
boardmembers@hsr.ca.gov

加州高鐵管理局

L街770號,620室
加利福尼亞州薩克拉門托 95814
(916) 324-1541
info@hsr.ca.gov

如欲翻譯,請寄至 BusinessPlan2024@hsr.ca.gov。請等待 1-2 個工作天的回覆。  

注意

根據《公共事業法典》第185033 條的規定,加州高鐵管理局(管理局)必須在5 月1 日準備、發布、採用並向立法機關提交更新後的商業計劃。該法規還規定,至少在5月1 日之前60 天在提交給立法機關後,管理局必須公佈商業計劃草案以供公眾審查和評論。商業計劃在偶數年發布。業務計劃代表了高鐵計劃在某個時間點的狀態,並總結了管理局實施該系統的方法。商業計劃包括:

  • 近兩年的進展總結
  • 回顧當前的挑戰以及如何應對這些挑戰
  • 更新資本成本和其他估計
  • 更新的乘客量和收入預測
加利福尼亞州高鐵管理局盡一切努力確保網站及其內容符合加利福尼亞州規定的Web內容可訪問性指南2.0級AA標準所規定的ADA規定。如果您要查找不在加利福尼亞高速鐵路管理局網站上的特定文件,則可以通過“公共記錄法”頁面根據“公共記錄法”來請求該文件。如果您對網站或其內容有任何疑問,請通過以下方式與管理局聯繫: info@hsr.ca.gov.