新聞稿:加州高鐵管理局董事會完成了連接舊金山市中心和洛杉磯市中心的最終環境里程碑

463 Miles Now Environmentally Cleared

June 27, 2024

 

您需要了解什麼:

The California High-Speed Rail Authority Board of Directors has approved the final environmental document for the Palmdale to Burbank project section. This major milestone is the final environmental clearance needed for the route from downtown San Francisco to downtown Los Angeles, with only the Los Angeles to Anaheim section remaining in Phase 1.

 

BURBANK – The California High-Speed Rail Authority (Authority) Board of Directors today approved the final environmental document for the 38-mile segment between Palmdale and Burbank. The approval of the Final Environmental Impact Report/Environmental Impact Statement (EIR/EIS) is the last environmental clearance between downtown San Francisco and downtown Los Angeles.

At speeds up to 220 mph, this section will connect the Antelope Valley to the San Fernando Valley in a roughly 17-minute train trip – more than twice as fast as traveling by car.

“This is a transformative project for the state of California as a whole, and today’s approval is a major milestone for connecting San Francisco to Los Angeles in less than three hours. It’s also transformational for Los Angeles County, connecting Palmdale to Burbank in a way that’s never been possible before.” — CEO Brian Kelly

The Board’s actions move this section closer to being “shovel-ready” as funding becomes available, marking the third certification of an environmental document in the Southern California region and the second in the Los Angeles Basin since 2022.

Map of Palmdale to Burbank with facts: 17 minute travel time, 38 miles long, 30 miles underground, 4 tunnels.

 

“Today’s approval is more than a historic milestone – it closes the gap between Los Angeles and San Francisco,” said Authority Board Chair Tom Richards. “We value our Authority team and its tireless support and collaboration with local and regional agencies and stakeholders as we work together to improve transportation in California for future generations.”

The Palmdale to Burbank Project Section will connect two key population centers in Los Angeles County by linking future multimodal transportation hubs in Palmdale and Burbank. The section features about 30 miles of tunneling, including 28 miles through mountains.

The Board approved the SR14A Alternative, which runs partly along State Route 14 and is approximately 38 miles long. It will be a grade-separated, high-speed rail-only system. Trains will be underground through the community of Acton and much of the Angeles National Forest and the San Gabriel Mountains National Monument.

The approved alignment reduces the length of tunneling that would traverse the Angeles National Forest and San Gabriel Mountains when compared to other alternatives. Tunneling through these regions minimizes impacts to communities and environmental resources in the region.

The Authority serves as the lead agency under the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). The Draft EIR/EIS was circulated for public review and comment from early September through early December 2022.

All that remains to environmentally clear the full 494-mile Phase 1 system of the project is the Los Angeles to Anaheim segment, which the Authority expects to finalize next year.

The Authority has begun work to extend the 119 miles currently under construction to 171 miles of future electrified high-speed rail from Merced to Bakersfield. There are currently more than 25 active construction sites in the Central Valley, with the Authority having now fully environmentally cleared 463 miles of the high-speed rail program from the Bay Area to Los Angeles County.

For the latest on high-speed rail construction, visit www.buildhsr.com.

以下連結包含近期影片、動畫、攝影、新聞中心資源和最新效果圖:https://hsra.app.box.com/s/vyvjv9hckwl1dk603ju15u07fdfir2q8

這些文件均可免費使用,由加州高速鐵路管理局提供。

 

演說局

加州高速鐵路管理局發言人局由通訊辦公室管理,提供有關高速鐵路計劃的信息演示。

請求演講者

接觸

吉姆帕特里克
916-502-3531
Jim.Patrick@hsr.ca.gov

 

 

 

 

媒體查詢

各個領域都需要。

加利福尼亞州高鐵管理局盡一切努力確保網站及其內容符合加利福尼亞州規定的Web內容可訪問性指南2.0級AA標準所規定的ADA規定。如果您要查找不在加利福尼亞高速鐵路管理局網站上的特定文件,則可以通過“公共記錄法”頁面根據“公共記錄法”來請求該文件。如果您對網站或其內容有任何疑問,請通過以下方式與管理局聯繫: info@hsr.ca.gov.