VIDEO RELEASE: High-Speed Rail Celebrates Groundbreaking of McKinley Avenue and Golden State Boulevard Grade Separation Project

2024년 12월 10일

당신이 알아야 할 것:

The McKinley Avenue and Golden State Boulevard Grade Separation Project will help improve safety for drivers, bicyclists and pedestrians in the city of Fresno. Spanning 402 feet long, the structure will take traffic over the existing freight and future high-speed rail tracks.

 

FRESNO, 캘리포니아. –The California High-Speed Rail Authority (Authority) alongside local and state leaders today celebrated the groundbreaking of the McKinley Avenue and Golden State Boulevard Grade Separation in the City of Fresno.

Start the above player to watch the video.

“Breaking ground on this massive grade separation highlights continued progress the high-speed rail project is making in California’s Central Valley. This paves the way toward fulfilling our commitment to Californians by delivering a state-of-the-art, electrified high-speed rail system capable of achieving speeds of 220 mph.”
– Ian Choudri, Authority CEO 

The McKinley Avenue and Golden State Boulevard grade separation project is located between State Route 99 and West Avenue in Fresno. When complete, the grade separation will serve as a four-lane roadway, spanning 402 feet long and more than 78 feet wide. The bridge will also have pedestrian access and bike lanes improving safety for residents in the area. The grade separation is being built by contractor Tutor-Perini/Zachry/Parsons.

“It’s great to see progress on the nation’s first high-speed rail system during such a pivotal time in Fresno’s history. We continue to see commitment, belief, and investments in our city from our partners at the state level, and today’s groundbreaking supports the larger goal of a transformative rail system and station in our city’s core – all while ensuring improved pedestrian safety and traffic flow around the tracks.”
– Mayor Jerry Dyer, City of Fresno

Graphic shows a rendering of the future structure on the left, and a high up drone shot of the current state of the real McKinley Avenue. Graphic looks like arrows pointing from left to right, symbolizing process and progress.

The Authority has begun work to extend the 119 miles currently under construction to 171 miles of future electrified high-speed rail from Merced to Bakersfield. The Authority also has full environmental clearance on 463 miles of the high-speed rail program from the Bay Area to downtown Los Angeles.

There are more than 30 active construction sites and nearly 50 completed structures in California’s Central Valley. Since the start of high-speed rail construction, the project has created more than 14,000 construction jobs, a majority going to residents of the Central Valley.

In addition, the Authority is committed to small businesses playing a major role in the build out of the project. A total of 875 certified small businesses have worked on the high-speed rail program statewide, with 229 of those certified small businesses residing in the Central Valley.

고속철도 건설에 대한 최신 정보는 다음에서 확인하세요. www.buildhsr.com

다음 링크에는 최근 비디오, 애니메이션, 사진, 프레스 센터 리소스 및 최신 렌더링이 포함되어 있습니다. https://hsra.app.box.com/s/vyvjv9hckwl1dk603ju15u07fdfir2q8

Files are all available for free use, courtesy of the California High-Speed Rail Authority.

Open below images for larger versions.

 

연사 국

California High-Speed Rail Authority Speakers Bureau는 Communications Office에서 관리하며 High-Speed Rail 프로그램에 대한 정보 프레젠테이션을 제공합니다.

연사 요청

접촉

오지 블랑카스
559-720-6695 (ㄷ)
오기 블랑카스@hsr.ca.gov

미디어 문의

모든 항목을 채워야합니다.

캘리포니아 고속철도 당국은 웹 사이트와 그 콘텐츠가 캘리포니아 주에서 규정 한 웹 콘텐츠 접근성 지침 2.0 레벨 AA 표준에 따라 의무적 ADA 요구 사항을 충족하도록 모든 노력을 기울이고 있습니다. California High-Speed Rail Authority 웹 사이트에없는 특정 문서를 찾고있는 경우, Public Records Act 페이지를 통해 Public Records Act에 따라 문서를 요청할 수 있습니다. 웹 사이트 나 그 내용에 대한 질문이 있으시면 당국에 연락하십시오. info@hsr.ca.gov.