Reunión pública de evaluación de Wasco para el proyecto del sistema de almacenamiento de energía fotovoltaica y de baterías del Valle Central
Miércoles 12 de marzo de 2025
De 17:00 a 19:00 horas
(Presentación PV/BESS a las 5:30 pm)
Salón de Veteranos de Wasco (Sala 1)
Avenida Poplar 1202, Wasco, CA 93280
Download Flyer (English)Documento PDFDownload Flyer (Spanish)Documento PDF
Learn about California High-Speed Rail’s future Photovoltaic and Battery Energy Storage System (PV/BESS) Project in the Central Valley. The public scoping meeting will include an overview of the project, followed by an opportunity to share comments and speak with members of the project team. Public feedback will help guide the project team through the preparation of the environmental draft documents.
Spanish, Hmong, and ASL interpretations will be available. All requests for reasonable accommodation must be made 72 hours before the meeting date. For additional information, please contact us at (916) 324-1541.

TRADUCCIÓN
Para asistencia de consulta y / o traducción, llame al (916) 324-1541 o envíe un correo electrónico info@hsr.ca.gov.
Para asistencia TTY / TTD, llame al (800) 881-5799 o al Servicio de retransmisión de California al 711.
CONTACTO
Comunicaciones y relaciones con los medios
(916) 322-1422
noticias@hsr.ca.gov
Oficial de privacidad
(916) 324-1541
oficial de privacidad@hsr.ca.gov