Image of a recycling icon.亮點來自 第六章

永續基礎設施

  • Sustainable Infrastructure Principles: Established in 2016, these principles guide the design, construction, and operation of the high-speed rail system, emphasizing sustainability and aligning with global best practices and California state regulations.
  • Envision Certification: Phase 1 of the high-speed rail project has been awarded a Platinum rating through the Institute for Sustainable Infrastructure’s Envision certification process. We are committed to maintaining our Platinum rating as we advance design of the Central Valley stations and Merced and Bakersfield extensions.
  • Environmental Product Declarations (EPDs): The Authority requires EPDs for construction materials to identify and reduce the global warming potential of materials used in our project.
  • Climate Adaptation and Resilience: The project integrates climate adaptation principles into its design and construction, using the latest climate data to ensure resilience against hazards like floods, wildfires, and extreme heat.
  • Worker and Community Safety: The Authority prioritizes the safety and well-being of workers, contractors, and communities, achieving lower injury rates and lost days compared to state benchmarks.
  • Community Benefits: High-speed rail stations will serve as community resources with green spaces and connectivity features, and grade separations will improve safety, reduce emissions, and enhance access to jobs and services.

Non-Hazardous Materials Composition (in tons), 2015-2023

點擊圖像以了解更多詳細資訊。

加利福尼亞州高鐵管理局盡一切努力確保網站及其內容符合加利福尼亞州規定的Web內容可訪問性指南2.0級AA標準所規定的ADA規定。如果您要查找不在加利福尼亞高速鐵路管理局網站上的特定文件,則可以通過“公共記錄法”頁面根據“公共記錄法”來請求該文件。如果您對網站或其內容有任何疑問,請通過以下方式與管理局聯繫: info@hsr.ca.gov.