亮点来自 第六章
可持续基础设施
- Sustainable Infrastructure Principles: Established in 2016, these principles guide the design, construction, and operation of the high-speed rail system, emphasizing sustainability and aligning with global best practices and California state regulations.
- Envision Certification: Phase 1 of the high-speed rail project has been awarded a Platinum rating through the Institute for Sustainable Infrastructure’s Envision certification process. We are committed to maintaining our Platinum rating as we advance design of the Central Valley stations and Merced and Bakersfield extensions.
- Environmental Product Declarations (EPDs): The Authority requires EPDs for construction materials to identify and reduce the global warming potential of materials used in our project.
- Climate Adaptation and Resilience: The project integrates climate adaptation principles into its design and construction, using the latest climate data to ensure resilience against hazards like floods, wildfires, and extreme heat.
- Worker and Community Safety: The Authority prioritizes the safety and well-being of workers, contractors, and communities, achieving lower injury rates and lost days compared to state benchmarks.
- Community Benefits: High-speed rail stations will serve as community resources with green spaces and connectivity features, and grade separations will improve safety, reduce emissions, and enhance access to jobs and services.
Non-Hazardous Materials Composition (in tons), 2015-2023
加利福尼亚州高铁管理局尽一切努力确保网站及其内容符合加利福尼亚州规定的Web内容可访问性指南2.0级AA标准所规定的ADA规定。如果您要查找不在加利福尼亚高速铁路管理局网站上的特定文件,则可以通过“公共记录法”页面根据“公共记录法”来请求该文件。如果您对网站或其内容有任何疑问,请通过以下方式与管理局联系: 邮箱:info@hsr.ca.gov.