Dịch vụ Thiết kế-Xây dựng Tiến bộ dành cho Yêu cầu về Sức kéo cho Đề xuất

The California High-Speed Rail Authority (Authority) anticipates issuing a Request for Proposals (RFP) to procure a contract for the Progressive Design Build of its traction power, solar photovoltaic (PV), and battery storage systems (BESS) components.

Scope – Term – Budget

Subject to Board approval, the Authority intends to enter into a progressive design-build contract for the design, construction, testing, and maintenance of the traction power components described above towards completion of the California High Speed Rail. The scope of work includes all necessary design, construction, and testing activities, as well a maintenance component yet to be determined. The Authority anticipates that the resulting contract term will be until December 31, 2030; plus a 5-year maintenance obligation following commencement of revenue services. The anticipated overall funding is $1.2 billion. Collaboration between the selected contractor and the Authority, including other Authority contractors, is paramount to the success of this project and will be emphasized throughout its procurement and implementation.

Tentative Schedule

  • Industry Draft Review of RFP / One-on-One Meetings with Interested Prime Firms: August 2024
  • RFP Release: Early Fall 2024
  • Proposals Due: Winter 2025
  • Notice of Proposed Award: Spring 2025
  • Contract Execution and Notice to Proceed: Summer 2025

Draft RFP Documents

July 18, 2024 Industry Notice on Draft RFP Documents for Review

Industry review will commence on August 1 and conclude on August 12. The documents that will be available for review comprise:

  • Draft General Terms and Conditions
  • Draft Scope of Work

Documents will be posted on Cal eProcure. Please see Industry Notification above for directions and deadlines to submit comments and to request a one-on-one meeting. These are draft documents for review and comment; the Authority reserves the right to make amendments as necessary and amend the tentative schedule.

Doanh nghiệp nhỏ

Small businesses are encouraged to visit the Trang web Chương trình Doanh nghiệp Nhỏ của Cơ quan để biết thông tin bao gồm tổng quan về chương trình, chứng chỉ mà chúng tôi công nhận, cách được chứng nhận, quyền truy cập vào sổ đăng ký nhà cung cấp của chúng tôi, v.v.

Conflicts of Interest

If you have questions about potential organizational conflicts of interest, please review the Authority’s Organizational Conflict of Interest Policy at the following link and submit queries and/or a request for an Organizational Conflict of Interest determination to the Authority’s Chief Counsel, Alicia Fowler, at legal@hsr.ca.gov, and Lisa Crowfoot at lisa.crowfoot@hsr.ca.gov, expressly referencing the PDB Traction Power RFP.

Questions

Các câu hỏi liên quan đến việc mua sắm này phải được gửi đến Rachael Wong tại Power@hsr.ca.gov hoặc (916) 324-1541.

Cơ quan Đường sắt Cao tốc California cố gắng hết sức để đảm bảo trang web và nội dung của trang web đáp ứng các yêu cầu bắt buộc của ADA theo Nguyên tắc Tiếp cận Nội dung Web bắt buộc của Tiểu bang California tiêu chuẩn 2.0 Mức AA. Nếu bạn đang tìm kiếm một tài liệu cụ thể không có trên trang web của Cơ quan Đường sắt Cao tốc California, bạn có thể yêu cầu tài liệu đó theo Đạo luật Hồ sơ Công cộng thông qua trang Đạo luật Hồ sơ Công cộng. Nếu bạn có bất kỳ câu hỏi nào về trang web hoặc nội dung của nó, vui lòng liên hệ với Cơ quan quản lý tại info@hsr.ca.gov.