Facilities Design Services
Subject to approval by its Board of Directors (Board), the California High-Speed Rail Authority (Authority) anticipates issuing a Request for Qualifications (RFQ) to procure an architectural and engineering (A&E) contract for Facilities Design Services.
Disclaimer: The scope of this procurement may be subject to change.
Scope – Term – Budget
This procurement will result in a contract with a scope of work that provides for the design services and the design support services during construction of the Authority’s facilities (excluding stations), associated access walkways, access roads, foundations, sewage systems, drainage systems, and vehicle parking, for the 171-mile Early Operating Segment from Merced to Bakersfield.
The RFQ will qualify the successful offeror for 100% of the designs, which includes the following facilities: Operations Control Center (OCC); Backup Operations Control Center (BOCC); Maintenance of Way Facilities (MOWF); Maintenance of Way Siding (MOWS); Heavy Maintenance Facility (HMF); Light Maintenance Facility (LMF); Stores/Warehouse; Train Certification Facility (TCF); Integrated Test Facility (ITF); Training Facility; and Walkways/road access/layouts/ vehicle parking/foundations/security/ fencing/internal and external space for each facility.
Be advised, however, that not all of the above-referenced design work is guaranteed under this contract. The Authority will maintain the option at its sole discretion, to reprocure the designs of some of the facilities identified above through other contracts as the program needs, funding and requirements evolve.
The resulting A&E contract will have a term of six years and two months with a not-to-exceed amount of $43 million. It is currently anticipated that the facility designs will support a design-bid-build construction methodology. The Authority will issue NTP 1 to the Consultant to commence work after the execution of the Agreement by both parties, and the anticipated structure for the NTPS for work as follows:
NTP 1: Will include completion of the design principles stage for the facilities, completion of the detailed design stage for the MOWF, LMF, OCC, TCF, and Training Facility, including related construction support services. Cost of Services: $43 million.
NTP 2: Will include the completion of the design principles stage and detailed design stage for the HMF, including construction support services.
NTP 3: Design of the remaining facilities BOCC, ITF, MOWS, Stores/Warehouse as prioritized by the Authority according to program funding availability, needs and requirements. This work will also include construction support services.
Schedule
Subject to Authority Board approval, the anticipated schedule for this procurement is under development.
Access
The RFQ will be available to download from the California State Contracts Register (CSCR). Updates, including responses to written questions and any RFQ addenda, will be provided on the CSCR.
Visit the Authority’s Small Business Program webpage for information including a program overview, certifications we recognize, how to get certified, access to our vendor registry, and more.
Conflicts of Interest
If you have questions about any potential organizational conflict of interest, please submit questions and/or a request for an Organizational Conflict of Interest determination to the Authority’s Chief Counsel, Alicia Fowler, at Legal@hsr.ca.gov, and Tawnya Southern, at Tawnya.Southern@hsr.ca.gov referencing the Facilities Design Services RFQ. For determination requests, the requestor is asked to provide information identified in the Organizational Conflict of Interest Checklist (RFQ section 3.7).
Questions
Questions regarding this procurement should be submitted to Richard Yost at FacilitiesDesign@hsr.ca.gov or (916) 324-1541.
- Archived Architectural & Engineering and Capital Procurements
- Request One-on-One Meetings Prior to Issuance of a Procurement
- Construction Management Services for Rail Design-Build-Maintain Contracts
- Facilities Design Services
- High-Speed Trainsets and Related Services
- Independent Safety Assessor Services
- Progressive Design-Build Services for Traction Power Request for Proposals
- Property Management Environmental Services Request for Qualifications
- Construction Manager/General Contractor (CM/GC) for Track and OCS
Contact
Small Business Program
(916) 431-2930
sbprogram@hsr.ca.gov
Contracts Office
(916) 324-1541
info@hsr.ca.gov
Procurement Point of Contact
(916) 324-1541
capitalprocurement@hsr.ca.gov
The California High-Speed Rail Authority makes every effort to ensure the website and its contents meet mandated ADA requirements as per the California State mandated Web Content Accessibility Guidelines 2.0 Level AA standard. If you are looking for a particular document not located on the California High-Speed Rail Authority website, you may make a request for the document under the Public Records Act through the Public Records Act page. If you have any questions about the website or its contents, please contact the Authority at info@hsr.ca.gov.